WASTEWATER TREATMENT PLANTS


Wastewater treatment plants with capacities from 100 to 2000 EP (equivalent population) are made of jointless prefabricated reinforced concrete tanks. We provide everything from design to commissioning. Our know-how is based on more than 30 years of experience in the Czech Republic and 60 years of experience in Germany.

Čistírny odpadních vod BETONBAU
ČOV
ČOV

BETONBAU SERVICES INCLUDE:

  • design and development of project documentation,
  • production, transport and installation of precast concrete,
  • installation of technologies,
  • commissioning, inspections and after-sales service.

ADVANTAGES OF BETONBAU WASTEWATER TREATMENT PLANTS

  • We design each project individually according to the specified parameters and the requirements of the water authorities for the quality of the treated water
  • The BETONBAU wastewater treatment plant is a modular system that allows for continuous expansion with an additional, parallel line
  • The surface of the tanks is resistant to the action of wastewater
  • The perfectly watertight facility does not require additional waterproofing
  • High durability and reliability
  • Quick and clean installation even in adverse climatic conditions, without wet construction processes
  • No requirements for site equipment
  • Ecological construction process also suitable for protected areas and national parks
  • Many options and finishes for the architectural design of above-ground buildings.
Čistírny odpadních vod BETONBAU
PRODUCTION

We produce jointless reinforced concrete tanks using bell-casting technology. The bottom and all four walls are cast at the same time. The result is a tub-shaped prefabricated space that is perfectly watertight and does not require additional waterproofing. These advantages are not achievable with conventional on-site concreting. The tanks are manufactured from C35/45 waterproof concrete, placed in steel moulds and compacted by high-frequency vibration.

Bezesparé lití
Bezesparé lití

TRANSPORT AND ASSEMBLY

The treatment plant technology is partially assembled into tanks in the production hall. This eliminates the requirement for site facilities. The prepared and equipped tanks are then transported to the construction site by truck and installed at the excavation site by an assembly crane. Installation usually takes several hours. On the construction site, the technological unit is completed and put into operation.

CONSTRUCTION READINESS
CONSTRUCTION READINESS
ASSEMBLY OF THE COVER PLATES
ASSEMBLY OF THE COVER PLATES
ASSEMBLY OF THE CONSTRUCTION PART
ASSEMBLY OF THE CONSTRUCTION PART
INSTALLATION OF THE ABOVE-GROUND BUILDING
INSTALLATION OF THE ABOVE-GROUND BUILDING
INSTALLATION OF THE TECHNOLOGY
INSTALLATION OF THE TECHNOLOGY
BUILDING READY FOR APPROVAL
BUILDING READY FOR APPROVAL
Contact us

We will find the optimal solution for your project. Ask our sales and technical representatives for advice or a non-binding quotation.

Co nás pohání
Co nás pohání

Zásady ochrany osobních údajů

Naše webové stránky používají externí komponenty, jako je Google Analytics a Google Fonts, které mohou shromažďovat údaje o tom, jak tyto webové stránky používáte. Zásady ochrany osobních údajů. Informace o ochraně údajů